Family house, Cuffley

Main contractor · Cuffley, Hertfordshire · Detached family house, newly built on the plot of the house it replaced. · Painting and wallpapering throughout a family house, for the main contractor · 2023 to 2024. · Credits below

A detached family house in Cuffley with timber panelling in most of the principal rooms. The main contractor asked us for the whole of the painting and wallpapering: the panelling, the walls and ceilings, the joinery and the feature papers in the downstairs WC and playroom. Nothing else. We started in the winter of 2023 and photographed the finished rooms in April 2024.

The brief

Every principal room carried bare timber panelling. Full height in the hall and the living room, dado height along the hallway and on the landing, with a bay window seat and a panelled fireplace wall to match. The main contractor wanted one decorating contractor for all of it, from the first primer on bare timber to the last coat on the final ceiling. The feature wallpapers in the downstairs WC and playroom were ours as well. Our scope was painting and wallpapering only. Everything else was other trades. The house was a live construction site with every other trade in it, not an occupied home. We followed the plasterers, who had whitewashed the house through. We started once the skirtings were on. The site was busy enough that some of our work ran at weekends.

Our approach

Unpainted panelling is unforgiving. Every joint, mitre and pin hole reads through a painted finish, so preparation matters more than the paint. We fill and sand the timber, caulk every junction between panel and wall, prime the bare timber and build the colour in thin coats so the mouldings keep their edges. The photographs from March 2024 show the hall panelling filled and primed before any colour went on. Wallpapers go up last, on prepared walls, with the pattern set out from the centre of each wall and the repeat checked at each corner before the next drop. The ceilings took Tikkurila Anti Reflex White (2), the walls Tikkurila Optiva Matt tinted and the woodwork Benjamin Moore Scuff-X. The feature papers came through Jane Clayton & Company, including Cole & Son x Fornasetti, Procuratie Con Vista, in Soot & Snow, hung in the downstairs WC, alongside a botanical feature paper in the playroom. We close the door behind us, keep dust inside the working area and ensure no dusty trades operate on the finished floors.

On site

The progress photographs show the sequence in each room: bare panelling, then primer, then the finish coats. On 3 April 2024 the stone fireplace surround sat under film while we painted the panelling around it. On 29 April the hall and the living room were still under dust sheets with the last coats going on. The downstairs WC paper had gone up over a sheeted basin on 8 March. We photographed every finished room on this page the next day, 30 April 2024. We worked room by room behind the other trades: preparation once the skirtings were on, then the finish coats, then the papers last of all. Sam and Jack walked the snagging themselves at the end.

The result

A house that reads as one hand from the hall to the top landing. The panelling has a flat, even finish with clean edges to every moulding, in the hall, the living room and along the hallway. The downstairs WC carries a monochrome architectural paper above dark painted panelling, with the dado line as the break between the two. The playroom paper is set out to the sash windows, the pattern running symmetrically to the reveals on both sides. We photographed every finished room on this page on 30 April 2024. A year on we went back for a programmed remedials visit, agreed with the main contractor and instructed as priced work rather than a free call back, to look over every room and put right anything minor.

Photographs

Entrance hall of a family house in Cuffley with painted panelling either side of a black front door, the stair rising to the left and a herringbone floor
The entrance hall from inside. Panelling filled and caulked at every joint and primed on bare timber before the finish coats, the same colour carried across the door surround, the dado and the stair string
Living room fireplace wall with painted panelling either side of a stone surround and a pendant above
The fireplace wall, panelled and painted to match the hall. The stone surround is not ours; the 3 April progress frames show it wrapped in film while the panelling around it was painted
Downstairs WC with a monochrome architectural wallpaper above dark painted panelling, a basin on a metal stand and a WC
The downstairs WC: dark painted panelling below the dado and Cole & Son x Fornasetti Procuratie Con Vista paper above, set out from the centre of the wall so the repeat aligns cleanly at each corner
Living room panelling running to full-width sliding glass doors onto a lawn, herringbone floor in the foreground
Panelling to the garden doors, the final ground floor room completed. The herringbone timber flooring was fully sheeted and protected before the final coat was applied
Master ensuite with a sage green vanity, twin mirrored cabinets and brass wall lights on a soft grey wall
Master ensuite walls and ceiling painted around the sage green vanity and mirrored cabinets installed by others, with wall colour carried behind brass sconces and into window reveals
Playroom with a botanical feature wallpaper on the end wall, sash windows and a herringbone floor
A botanical feature paper on the playroom wall, hung on prepared surfaces and set out from the centre so the pattern meets each window reveal symmetrically
Long ground floor hallway with dado-height panelling on both sides, glazed steel doors and a pendant light
The hallway, dado-height panelling both sides, painted in the same finish as the hall so the ground floor reads as one continuous surface
Hall panelling filled and primed before the finish coats, joints caulked and pin holes filled
Preparation in March 2024: every joint caulked, every pin hole filled, the bare timber primed. This is the stage that decides how the finish looks a year on
Downstairs WC mid-way through papering, the architectural pattern going up above dark panelling with dust sheets over the basin
The downstairs WC paper going up over a sheeted basin on 8 March 2024, the pattern set out from the centre of the wall and the first drops plumbed before the rest followed
Bay window seat with painted panelling below the sashes and a view over the garden
The bay window seat, its panelled front painted in the same finish as the walls so the seat and the wall read as one piece of joinery
The stair from below, painted panelling on the wall and a dark timber handrail on black metal balusters
The staircase from the half landing: painted timber panelling carried up the flight, with the dark timber handrail varnished and metal balustrades painted by SFS to complete the stair enclosure

Credits

  • Main contractor: First Building Services Ltd.