Art deco entrance hall on Jermyn Street with fluted pilasters, a stepped ceiling and a terrazzo roundel floor, looking towards the reception.

Jermyn Street, communal stairs and entrance hall

ZES, the building managers. · Jermyn Street, St James's, SW1Y · Period office building, in occupied use. · Redecoration of an art deco entrance hall, its lift lobby and the communal stairs above, in an occupied office building. · empty · Credits below

The offices at Jermyn Street stayed open for the whole job. We redecorated the communal staircase around them and the art deco entrance hall at the foot. There are around eight floors of stairs. The stairs are how everyone in the building gets to work. They had to stay open, safe and clean every day we were on them. That is the difficult part of a job like this. The painting is the easy half.

What was it like before?

The building was tired. The hallway was rough, with marks up the walls where deliveries had come in. The stairs were in a bad way as well. That is the ordinary state of a communal route in an office building that has been working hard for years.

How do you redecorate the stairs in a building that stays open?

The offices stayed in use throughout. That is the constraint that shapes everything else on a job like this. People came in to work every morning and went up the same stairs we were painting. The hall was under protection for about six days in total. It had to stay safe to walk through for all six.

So the work goes in around the building rather than the other way round. Nothing is left open overnight that a person could walk into. The route stays usable at the end of every day.

What did we paint, and how?

The hall and the stairs are in a Farrow and Ball colour. We painted the stepped ceiling and the fluted pilasters by hand. A stepped ceiling shows every miss, because each recess takes the light from the downlights at a different angle. We cut the junction at the mural in by hand as well, carefully and intricately. The mural itself was not ours to touch.

The marble, the terrazzo roundel and the red velvet banquette were not ours to touch either. On a hall like this one, bringing them through unmarked is half the job.

In what order did it go?

The stairwell came first. We painted the lift lobby after it. The front doors went last, in black. They were the only exterior work in the scope.

What does it look like now?

The stepped ceiling reads as clean lines under the downlights. The pilasters carry an even finish from the marble base to the capital. The painted walls meet the green marble plinths with no mark on the marble. The terrazzo roundel, the mural and the banquette came through the works unmarked.

Photographs

Art deco corridor with fluted pilasters either side, a terrazzo roundel in the floor, green marble plinths and a pendant light
The hall finished, 4 May 2021: pilasters, stepped ceiling and walls painted in a Farrow and Ball colour, the terrazzo roundel and the green marble plinths uncovered and unmarked
Curved alcove with a red velvet banquette, green marble plinth and fluted pilaster, painted walls above
The banquette alcove: the curved plaster above the marble plinth painted to match the pilasters, the red velvet and the marble as they were before the works
Geometric mural in reds and blues on a wall by the entrance, painted walls and ceiling around it
The mural stayed as it was. We cut the junction where the paint meets it in by hand, which is the first thing a visitor to this building sees
Lift lobby with two lifts in green marble surrounds, fluted pilasters and the terrazzo roundel in the foreground
The lift lobby, painted after the stairwell: walls and pilasters cut in around the green marble lift surrounds, the terrazzo roundel uncovered in the foreground
Scaffold tower on the terrazzo floor behind a yellow barrier, with the rest of the hall visible beyond
30 April 2021: the tower behind a yellow barrier with one section of the hall closed off. The rest of the hall stayed open, because the building was working around us
Reception desk with a patterned front under a painted ceiling with downlights
The reception desk uncovered, the wall and stepped ceiling above it finished. The same desk sits under polythene in the 30 April frames
Stone entrance on Jermyn Street with fluted pilasters, a fanlight and black painted double doors
The street entrance: the front doors painted black, the last thing we did on the job and the only exterior work in the scope
Lift lobby on 30 April 2021 with the walls under red sheeting, the lift doors closed and the terrazzo roundel uncovered
During the works: the walls under sheeting and the lifts still running, because the offices above stayed open throughout
Lift lobby looking towards the entrance with green marble surrounds, painted pilasters and the terrazzo floor
The lobby towards the entrance, the pilasters and walls finished and the terrazzo uncovered after the protection came up

Credits

  • Photography: SFS Interior & Exterior